# Retail data integration and fresh forecasting for 50–300 store chains

_Bakery, food-to-go and regional grocery_

We bring sales, stock and production data into one model and forecast every item, store and day on top of it. Orders and production plans land where your teams already work, and your systems stay as they are.

50–300 stores with a fresh assortment

**In short.** Retail data integration for a fresh food chain puts sales, stock, orders and production into one data model, where an item, a store and a day mean the same thing everywhere. dev.family forecasts every item, store and day on that model and carries the forecast into automatic ordering and production plans on your stack. The first step is a 4–6 week Forecasting Pilot on one category.

## Where fresh ordering usually breaks

Fresh product lives a day or two, so every ordering mistake turns into waste or an empty shelf.

- **[Store managers order from memory](https://dev.family/foodtech/demand-forecasting)**: Last week's spreadsheet stands in for a forecast. Holidays and swings in the weather make the error bigger.
- **[The bake plan can't see store sales](https://dev.family/foodtech/production-planning)**: The bakery or kitchen produces to yesterday's plan, not to tomorrow's demand in the stores.
- **[One item, five codes](https://dev.family/foodtech/pos-integration)**: After mergers, the same bread roll lives under different codes in the POS, the ERP and production.

## Thrown out and sold out in the same week

You know the pattern: on Monday you throw food out, and by Friday the shelf is empty.

| Seam | What happens | What it costs you | What we do |
| --- | --- | --- | --- |
| Store order | Orders come from a spreadsheet with last week's sales | Waste after slow days, empty shelves after busy ones | A forecast by item, store and day, delivered as a suggested order |
| Bake plan | Production follows yesterday's plan or orders phoned in by stores | Too much of one product and not enough of another, every morning | A production plan built from tomorrow's store forecast |
| Promotions and holidays | Managers adjust orders by gut feel | The biggest misses land on your busiest days | Promotions, holidays and weather built into the forecast |
| Item codes | One item lives under different codes in the POS, ERP and production | The forecast learns from mismatches between systems instead of from demand | One item master, mapped across systems |
| Measurement | Nobody tracks lost sales on fresh | You can't tell whether ordering is getting better | Weekly accuracy, availability and waste by category |

From our pilot for a 650-store chain: the comparison covered about 90% of the chain's automatic orders, so the result reflects everyday ordering, not a few test stores.

## A forecast that turns into action

- **[Demand forecasting and automatic ordering](https://dev.family/foodtech/demand-forecasting)**: A forecast for every item, store and day, and a suggested order right where managers already work.
- **[Production planning](https://dev.family/foodtech/production-planning)**: Bakery and kitchen plans built from tomorrow's store forecast, not yesterday's plan.
- **[POS and ERP integration](https://dev.family/foodtech/pos-integration)**: One data model for sales, stock, deliveries and promotions, with item codes matched across systems.
- **[Model and data support](https://dev.family/foodtech/managed-integrations)**: Accuracy monitoring, retraining and checks on every data load, under an SLA.

## How retail data comes together in one model

We read data from the systems you already run and write the order and the plan back into them. Your POS, ERP and ordering system stay in place.

POS: sales by receipt · read · ERP: stock and deliveries · read · Promotions calendar · read · Waste records · read, if you track them · Ordering system · we write the order · Production · we write the plan

The forecast belongs to you: the models, the code and the data stay with your chain.

## An ML forecast by item, store and day inside the chain's automatic ordering

The model forecasts daily demand for every item in every store and generates the automatic order. We compared it with the chain's existing auto-ordering on the same stores, covering about 90% of its automatic orders. Our work with the chain continues.

## Start with a pilot on one category

We test the forecast on your data before you change a single process.

- **Qualification** (45–90 minutes · free): What data you have, where the order lives today, and which category hurts most. a decision on which category to start with
- **Forecasting Pilot** (4–6 weeks): One category and a handful of stores. The forecast goes head to head with your current order on the same stores. accuracy before and after, and a Build estimate
- **Build: Forecasting** (8–16 weeks): The forecast inside ordering and production for every store and category from the pilot. automatic ordering and a production plan on your stack
- **Run** (12–36 months): Accuracy monitoring, model retraining and data checks. a forecast that doesn't go stale

We fix the Build estimate at the end of the pilot.

## When RELEX or Afresh is the right call, and when it isn't

If an off-the-shelf system already runs your fresh categories, you don't need a forecast from us.

| Option | Enough if | You need us if |
| --- | --- | --- |
| RELEX | You're a national chain with the budget and a team for the rollout | You're a 50–300 store chain that needs a forecast for a few fresh categories |
| Afresh | You're a US grocer, and fresh departments are the main focus | You need the forecast connected to your own bakery or kitchen production |
| Upshop, Logile | You want a full set of store operations in one product | You want a forecast built on your data that you own |
| Your ERP's reorder function | Min-stock reordering does the job | Short shelf life, weather, promotions and holidays drive your demand |

## When not to call us

- Fresh already runs on Afresh, RELEX, Upshop or Logile: you don't need our forecast; we can help with the data around it
- Under 50 stores: your ERP's features are probably enough
- A national chain with its own data science team: you need to hire, not bring in a vendor

## How do your stores calculate fresh orders today?

## Questions

### What is retail data integration, and what does it connect?

Retail data integration brings data from your POS, ERP, ordering system and loyalty program into one model, where an item, a store and a day mean the same thing everywhere. For fresh food, it's the foundation of any forecast: without one model, the forecast learns from mismatches between systems instead of from demand.

### Our fresh ordering lives in spreadsheets. What can we automate without replacing systems?

The forecast by item, store and day, and a suggested order that lands where managers already work: in the ERP, in the ordering system, or in a spreadsheet during the transition. Your POS and ERP stay. We read data from them and send back the order and the production plan.

### When is RELEX or Afresh too much for a 50–300 store chain?

When the license and the rollout are sized for a national chain, and what you need is a forecast for a few fresh categories tied to your own production. If one of those systems already runs your fresh categories, you don't need our forecast, only help with the data around it.

### What data do we need before a forecasting pilot?

At least a year of sales by item, store and day, plus orders and deliveries, stock, waste if you track it, your assortment and a promotions calendar. Gaps are normal. In the first week of the pilot we check the data and tell you what we can forecast right away.

### How long does a one-category pilot take?

Four to six weeks. We take one category, such as bread and pastry, and a handful of stores, run the forecast against your current order on the same stores, and show availability, lost sales and waste before and after. You come out of it with a decision and a Build estimate.

### Why does data mapping matter for a forecast?

So one bread roll is one bread roll in every system. After mergers, the same item often lives under different codes in the POS, the ERP and production. Mapping ties those codes together, so the forecast, the order and the production plan speak the same language.

### Do you work with chains in the US and the UK?

Sizl, a dark-kitchen chain in Chicago, is our US project. For a 16-brand restaurant group in Saudi Arabia, Kuwait, the UK and the US, we're launching its own ordering and delivery. Our Lisbon workday matches the UK and overlaps with US mornings.

### Why not build the forecast in-house?

You can, if your chain has data scientists and data engineers. Most don't: one analyst keeps ordering going in spreadsheets. We build the forecast on your stack, hand over the models and the code, and run them under an SLA for as long as you need.

## You talk to the people who will do the work

We don't have a sales team. On the call you get the founder and an ML engineer from our demand forecasting team.

- Max Bantsevich, Founder
- Kirill, ML engineer, demand forecasting

- Headquartered in Lisbon, in the EU: contract and DPA under EU rules
- We sign an NDA before the first call if you need one
- Security pack and data-flow diagram on request
- Our workday matches the UK and overlaps with US mornings
- You own the code, the models and the data

## Let's test the forecast on one category

Tell us which category hurts most and where the order lives today. We'll propose a pilot on your data.

It takes two minutes. If we're a fit, Max replies personally and suggests a time for a call.

## Keep reading

- **[Demand forecasting for fresh food](https://dev.family/foodtech/demand-forecasting)**
- **[Production planning for bakeries](https://dev.family/foodtech/production-planning)**
- **Grocery demand forecasting: where a 50–300 store chain should start**

---

Last updated: 2026-11-09
Page: https://dev.family/foodtech/food-retail
Contact: https://dev.family/project-evaluation