# Restaurant M&A IT integration: the first 100 days

_For groups and investors after a deal_

One report, one menu and one loyalty program across every brand, built on top of the registers that came with the deal. You don't have to replace the acquired POS in the first months.

For groups with 30–250 locations and their investors

**In short.** After a restaurant group buys another chain, it inherits another POS, another menu and another loyalty program, and someone ends up building the group report by hand. M&A IT integration in the first 100 days gives you one location and menu master, one report across every brand and one guest base, without replacing the registers. It usually takes 8–16 weeks. The first step is a 2–3 week Assessment.

## It's not just you

- The ONE Group's transition and integration costs for Benihana: $13.7M in FY2024. Source: The ONE Group, Form 10-K for FY2024, sec.gov. Covers more than systems: Benihana's menu, duplicate offices and roles, checked 2026-11-09
- Brands that name fragmented systems and data as a top-three barrier: 37%. Source: [Qu, 2026 State of Digital & Beyond: 168 brands, 94,000+ locations](https://stateofdigital.qubeyond.com), checked 2026-11-09
- Operators who name integration as the top factor in a POS purchase: 85%. Source: Hospitality Technology, POS Software Trends 2024, checked 2026-11-09

Checked November 9, 2026. Qu surveys chains larger than most groups we work with.

## What happens after the deal closes

Every deal has dates, and each one brings its own problem.

- **Day 0**: Close. Two POS systems, two menus, two loyalty programs.
- **Day 30**: Someone builds the group report by hand, and the numbers don't match.
- **Day 60**: The new menu goes out to each POS, one system at a time.
- **Day 100**: The transition services agreement (TSA) ends, and the seller switches off its systems.

## An 8–16 week merger integration checklist

Each step pays off on its own.

- **Assessment** (Weeks 1–3): A map of your systems and TSA deadlines, a menu mapping and a Build estimate.
- **Reporting** (Weeks 4–8): Sales from every brand in one HQ report.
- **Shared menu** (Weeks 6–12): One menu and one price list across every POS.
- **Guests** (Weeks 10–16): Loyalty moves over, and nobody loses points.

Timelines are typical for a deal involving 30–250 locations. We confirm them in the Assessment.

## What covers the first 100 days

- **[POS integration and a shared menu](https://dev.family/foodtech/pos-integration)**: One menu, one price list and sold-out items across every brand and POS.
- **[Reporting for HQ and franchisees](https://dev.family/foodtech/analytics)**: Sales from every register in one report, by brand and location.
- **[Loyalty migration](https://dev.family/foodtech/loyalty-migration)**: Points and guest history move over intact.

## Where it usually hurts

- Every franchisee has its own price tiers.
- The same item lives under different codes.
- Modifier groups don't match from one location to the next.
- Only the previous owner has API access to the platform.

## Who this page is for

- **[Restaurant groups and franchises](https://dev.family/foodtech/multi-brand-franchise)**
- **[Portfolio companies after a deal](https://dev.family/foodtech/private-equity)**

## Questions

### What is post-acquisition integration for a restaurant or retail group?

It's the work of the first months after buying a chain: connecting the acquired brands' registers, menus, loyalty and reporting to the rest of the group. The goal is to see the whole group in one report and run the menu and the guest from one place, without shutting any location down.

### Should we keep the acquired POS or move everyone to one?

Usually keep it at first. We bring the data together on top of the registers, and the group works as one within weeks. Moving to a single POS makes sense when it costs less than supporting two systems, and it happens location by location. We work out which is cheaper for you in the Assessment.

### What should we integrate in the first 100 days?

Whatever you can't run the group without: one sales report across every brand and a location and menu master, then a shared menu and prices. Loyalty and guest channels come next, once the data adds up.

### How long does integration take after a deal?

For a group with 30–250 locations, usually 8–16 weeks to a group report, a shared menu and a loyalty migration. The cross-brand report comes first, in 4–8 weeks. Timing depends on how many POS systems you run and whether you can get API access.

### What does a chain risk if the integration fails?

A report nobody trusts, a menu someone updates by hand at every register, and guests who lose their points. Then the TSA ends, and the seller's systems go dark before anything replaces them. That's why we start with a map of your systems and TSA deadlines.

### Which systems can we leave alone?

Usually the registers and platforms that work and let you get the data out. We build on top of them. Replace what expires with the TSA or won't give up its data.

### Do you work with chains in the US and the UK?

Sizl, a dark-kitchen chain in Chicago, is our US project. For a 16-brand restaurant group in Saudi Arabia, Kuwait, the UK and the US, we're launching its own ordering and delivery. Our Lisbon workday matches the UK and overlaps with US mornings.

## You talk to the people who will do the work

We don't have a sales team. On the call you get the founder and the engineer or PM who would run your integration. We don't need deal details until there's an NDA.

- Max Bantsevich, Founder
- Andrey Maksimenko, Project Manager

- Headquartered in Lisbon, in the EU: contract and DPA under EU rules
- We sign an NDA before the first call if you need one
- Security pack and data-flow diagram on request
- Our workday matches the UK and overlaps with US mornings
- You own the code, the models and the data

## Just closed a deal?

A call to work out where to start your first 100 days and what has to happen before the TSA ends.

---

Last updated: 2026-11-09
Page: https://dev.family/foodtech/post-acquisition-integration
Contact: https://dev.family/project-evaluation